From 1st October 2025, UK street works will manage excavation waste in a significantly different way. The new Street Works UK (SWUK) Material Classification Protocol becomes mandatory nationwide, replacing the Environment Agency’s Regulatory Position Statements (RPS) 298 and 299, which expire on 30 September 2025.
This shift marks more than just a regulatory update; it introduces a clearer and more consistent framework for classifying and reporting excavation materials. For utilities and contractors carrying out everything from emergency repairs to major street works, the protocol will have day-to-day implications both in the office and on site.
RPS 298 and 299: What They Are and How the SWUK Protocol Replaces Them
The Environment Agency created two Regulatory Position Statements (RPS 298 and RPS 299) that shaped how street and utility works managed excavation waste. The rules end on 30 September 2025, and Street Works UK replaces them with the new Material Classification Protocol.
RPS 298
- At a glance: RPS 298 let teams move excavation waste from street and utility works before classification when pre-excavation sampling wasn’t possible. However, it excluded hazardous materials such as visible asbestos or obvious coal tar.
- Why it existed: The Environment Agency introduced RPS 298 to give flexibility for reactive or short-notice excavations where pre-removal sampling wasn’t possible.
- Why withdrawal matters: After 30 September 2025, excavation waste from street and utility works must be classified and managed in accordance with the Street Works UK Material Classification Protocol, rather than RPS 298.
RPS 299
- At a glance: RPS 299 showed contractors how to store, separate, and move excavation waste under RPS 298 without a full environmental permit, provided they followed the stated conditions. It replaced RPS 211.
- Why it existed: The Environment Agency introduced RPS 299 to provide a practical framework for storing and managing excavation waste linked to RPS 298.
- Why withdrawal matters: As RPS 298 expires, RPS 299 automatically falls away, with both replaced by the Street Works UK Material Classification Protocol.
Street Works UK Material Classification Protocol: How It Works
Street Works UK (SWUK) developed the Material Classification Protocol as a sector-wide framework for handling excavation waste. It moves the industry away from short-term regulatory fixes and towards a risk-based, standardised system that applies across both reactive and planned works.
Rather than relying on temporary exemptions, the protocol requires companies to classify materials based on site conditions, proportionate sampling, and laboratory validation. This approach reduces inconsistency, cuts environmental risks, and creates a clear audit trail for regulators, utilities, and contractors.
To make compliance practical, the protocol sets out several key requirements. Below, we’ve broken them down into their main components:
How the Street Works Protocol Affects Office and Operational Teams
For office-based teams, the protocol does more than add a compliance box — it changes how they manage and report information.
- More data to handle: Teams must now add detailed desk-based assessments and lab results to the compliance record, store them digitally, and submit them each quarter through Street Manager and to Street Works UK.
- Training and systems: Staff will need to understand the new classification process and get comfortable with digital platforms. Many companies will look to upgrade or expand software systems to manage this flow of information.
- Cost and planning considerations: Mandatory testing and stricter segregation rules add to operational costs and require closer coordination between the office and site.
In short, compliance under the new protocol is as much an information management challenge as it is an operational one.
Street Works Protocol: What It Means for Field Workers On-Site
For site crews, the changes are immediate and hands-on.
- On-the-ground assessments: Workers must apply risk assessments to identify potential hazards, such as hydrocarbons, coal tar, or asbestos, before moving materials.
- Segregation at source: Teams must keep soils, asphalt, and hazardous and non-hazardous materials separate from the moment of excavation.
- Greater responsibility: Field teams now play a direct role in accurately classifying waste, making training in identification and segregation essential.
- Workflow adjustments: Extra steps, such as pre-excavation checks and careful material handling, may initially slow jobs, but they improve long-term efficiency and compliance.
These changes place more responsibility on field workers but also strengthen the role they play in ensuring environmental compliance and sustainable practices.
How to Stay Compliant with the Street Works UK Waste Protocol
Practical steps to stay compliant
Use this quick checklist on every job to meet the Street Works UK Waste Classification Protocol.
Depotnet: Supporting Compliance with the Street Works UK Protocol
You don’t need to make compliance with the new protocol complicated. Depotnet brings all the moving parts – risk assessments, testing records, waste transfer notes, and quarterly reporting – into a single, easy-to-use platform.
- Simplify assessments by uploading desktop reviews, completing site-based risk checks, and linking them directly to excavation records.
- Stay on top of reporting with built-in tools that generate compliant outputs for both Street Works UK and the Street Manager portal.
- Maintain full traceability by classifying waste, logging transfer notes, and keeping a clear audit trail across every project.
By embedding these features into day-to-day workflows, Depotnet helps contractors and utilities reduce admin time, cut compliance risks, and stay ahead of regulatory deadlines. When the new rules go live in October 2025, your teams will already be ready.