EV Charge Point Street Works: What the New DfT Guidance Means

The rollout of electric vehicle infrastructure is accelerating, but delivery on the ground has often been slowed by process rather than intent. Street works permits, licensing routes, and unclear responsibilities have created friction for organisations installing EV charge points.

New guidance from the Department for Transport (DfT) aims to address this. It provides clarity on how Electric Vehicle Charge Point Operators (EVCPOs) should operate within the street works framework – and crucially, confirms their position alongside traditional utilities.

For organisations involved in EV infrastructure, this marks a meaningful shift.

EVCPOs Recognised as Statutory Undertakers

One of the most significant updates is that EVCPOs can now be treated as statutory undertakers when carrying out street works.

In practical terms, this means:

  • EVCPOs can apply directly for street works permits
  • They no longer need to rely on third-party arrangements to access the highway
  • The process aligns more closely with how utilities such as water, gas and telecoms operate

This change removes a layer of complexity that has historically slowed EV charge point deployment.

For contractors and operators, it creates a more consistent and scalable delivery model, particularly for large rollout programmes.

Moving Away from Section 50 Licences

Alongside this update, the DfT has also clarified the role of Section 50 (S50) street works licences.

S50 licences are typically used by organisations that are not statutory undertakers, allowing them to carry out specific works on the highway.

The updated guidance makes it clearer that:

  • S50 licences should still be used in certain scenarios
  • However, they are not always the most appropriate route for EV infrastructure deployment
  • Activities such as recessed cabling through pavements may still fall under S50 depending on the work being carried out

The key takeaway is that there is now clearer distinction between when to use:

  • Street works permits (via statutory undertaker status)
  • Section 50 licences (for specific or limited works)

This clarity reduces ambiguity for both operators and local authorities.

What This Means for EV Infrastructure Rollout

For organisations delivering EV charge points, these changes are likely to have a direct operational impact.

Faster Approvals

With the ability to apply for permits directly, EVCPOs can streamline planning and reduce delays associated with third-party applications.

More Consistent Processes

Aligning EV charge point works with existing utility frameworks creates a more standardised approach across regions and authorities.

Improved Scalability

For large-scale rollout programmes, reducing administrative friction makes it easier to deliver projects at pace.

Clearer Compliance Expectations

With defined guidance, organisations can better understand their responsibilities and ensure works are carried out in line with regulations.

A Shift Towards Utility-Style Operations

This update reflects a broader trend: EV infrastructure is increasingly being treated like core utility infrastructure.

As charge point networks expand, the expectation is that operators will:

  • Plan works in coordination with other utilities
  • Comply with permit schemes and noticing requirements
  • Maintain accurate records of works and reinstatement
  • Demonstrate compliance with local authority requirements

For many organisations, this represents a shift from ad-hoc installation projects to structured, utility-style operations.

Operational Challenges Still Remain

While the guidance simplifies access to permits, delivery on the ground still comes with challenges.

Organisations must manage:

  • Permit applications and approvals across multiple authorities
  • Coordination with other street works and road users
  • Scheduling field teams and contractors
  • Ensuring compliance with noticing and timing requirements
  • Maintaining accurate records for audit and reporting

Without the right systems in place, these processes can still become fragmented.

How Depotnet Supports EV Charge Point Delivery

As EV infrastructure begins to follow the same operational model as utilities, having the right systems becomes increasingly important.

Depotnet supports organisations delivering street works by providing:

Centralised Permit Management

Manage permit applications, track approvals and maintain visibility across all works in one place.

Real-Time Coordination

Ensure field teams are aligned with approved works, timings and conditions.

Compliance Tracking

Maintain clear records of notices, permits and work activity to support audits and reporting.

Improved Visibility

Gain a complete view of planned and ongoing works across regions and teams.

Scalable Operations

Support growing EV rollout programmes with structured, repeatable processes.

Enabling the Next Phase of EV Infrastructure

The DfT’s updated guidance removes a key barrier to EV charge point deployment by aligning operators more closely with established utilities.

By enabling EVCPOs to operate as statutory undertakers, the process becomes more straightforward, more consistent and better suited to large-scale delivery.

However, as deployment accelerates, organisations will need to ensure their operational processes evolve alongside regulatory changes.

Those that adopt structured, digitally supported approaches to street works and permit management will be best positioned to deliver EV infrastructure efficiently and at scale.

EV Charge Point Street Works FAQs

As guidance evolves and EV infrastructure rollout accelerates, organisations are facing new questions around permits, licensing routes and operational responsibilities. The introduction of statutory undertaker status for EVCPOs and clearer direction on Section 50 licences has helped remove some uncertainty, but there are still important distinctions to understand. Below are answers to some of the most common questions around EV charge point street works and compliance.

What is an Electric Vehicle Charge Point Operator (EVCPO)?
An Electric Vehicle Charge Point Operator (EVCPO) is an organisation responsible for installing, operating and maintaining EV charging infrastructure. This includes on-street charge points and associated electrical connections within the public highway.
Can EVCPOs apply for street works permits?
Yes. Updated guidance from the Department for Transport confirms that EVCPOs can be treated as statutory undertakers, allowing them to apply directly for street works permits rather than relying on third-party arrangements.
What does statutory undertaker status mean for EV charge point installation?
Being treated as a statutory undertaker means EVCPOs can operate in a similar way to utilities such as water, gas and telecoms providers. This allows them to follow established street works permit processes, helping streamline approvals and improve delivery timelines.
When should a Section 50 (S50) licence be used?
Section 50 licences are typically used when organisations are not acting as statutory undertakers. They may still apply in certain EV installation scenarios, such as specific types of works like recessed cabling through pavements, depending on the nature of the activity.
How does the new guidance impact EV charge point rollout?
The updated guidance simplifies the process for installing EV charge points by allowing operators to access street works permits directly. This reduces administrative complexity, supports faster approvals and makes it easier to scale rollout programmes across multiple locations.
What operational challenges still exist for EVCPOs?
Despite the simplified permit process, organisations still need to manage coordination across multiple authorities, maintain compliance with permit conditions, schedule works effectively and keep accurate records for audit and reporting. Without structured systems, these processes can become fragmented.
Depotnet CTA banner – book a demo